Yantai Jinpeng Mining Machinery Co.,Ltd
Products
Contact Us
  • Contact Person : Mr. li sun
  • Company Name : Yantai Jinpeng Mining Machinery Co.,Ltd
  • Tel : 0086-0535-3020703
  • Fax : 0086-0535-2030703
  • Address : shandong,yantai,No. 11, Fuzhou Road, Yantai Development Zone, Shandong
  • Country/Region : China
  • Zip : 264006

Chute Feeder

Chute Feeder
Product Detailed
Related Categories:Agricultural Product Stock
CG600×500 Chute FeederOperation InstructionI. The main application600×500 chute feeder mainly used in ore dressing,Website:http://www.chinaminingepc.com, metallurgy, chemical industry, and cement industry, etc. Generally used before the crusher and first sage of the milling, it can make the mineral into the crusher more evenly.II. Specifications and performance(see table below)Outlet (L×W)  (mm)600×500Capacity  t/h10-50Max feed size mm200MotorModelY112M-4Power4kwIII. Equipment working principle and structureThe devices are installed on the bottom of the ore bin outlet, the ore fall onto the leakage board at the chute bottom, the bottom of the leakage board is fixed on the idler, and through the eccentric institutions to connect the leakage board and the reducer together, and then through the coupling lined the motor. During the operation the motor drive the reducer through the coupling, and through the eccentric dish and the leaking plate, which is at the bottom of the frame also between the idlers, to move in reciprocating linear way, and achieve the feed uniformly.1、Motor 2、Reducer 3、eccentric mechanism 4、idler 5、chute frameIV. Equipment operating instruction1. Double-check whether the bolts of the equipment and hopper are fastening or not.2. Check whether the all the lubrication point is full of lubricating oil.3. No allowing too much ore on the chute when start the equipment, it can feed ore only after the normal operation of equipment.4. Adjust the eccentricity of the feeder's two sides to the same, and the amplitude is no less than 5~5㎜.5. Before stop the equipment first should stop feeding, the electrical motor can be shut down only after all the ore are discharged.V. Product package and deliveryIf the users have no special requirements on transport packaging, then ship the equipment as a whole without any spare parts.VI. Possible malfunction and method of how to deal with it1.The reduce bearing in high temperaturea. Not enough oilb. bearing damagea. Add engine oilb replace the bearing2.The eccentric disk in high temperaturea. Not enough lubricant oilb. Wear due to lacking of lubricant oil.a. add some lubricant oilb. replace the bearingFrame swayingNo synchronization of the eccentric diskReplace the eccentric disk


Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.