Products
Contact Us
- Contact Person : Mr. li sun
- Company Name : Yantai Jinpeng Mining Machinery Co.,Ltd
- Tel : 0086-0535-3020703
- Fax : 0086-0535-2030703
- Address : shandong,yantai,No. 11, Fuzhou Road, Yantai Development Zone, Shandong
- Country/Region : China
- Zip : 264006
Jig
Product Detailed
Related Categories:Agricultural Product Stock
Sawtooth Wave JigOperating instructionOverviewJig dressing is a gravity separation. Process characteristics are: the selected mineral falls onto the screen panel of jig room to form a layer of material. To fill in the water through the sieve and make the beds loose and then the water level lower down (or stop rising). In this process, different density particles transfer, the heavy minerals enter into the lower layer, light minerals come into the upper level, after discharge to get concentrate and tailings.Sawtooth wave jig is a new type energy saving high efficient gravity separation equipment. The improvement is below: move in sawtooth waveform, the water rising fast but lowering down slow, the bed layer is whole up and falls slowly, the effective loose time is long, this whole process can greatly increase the capacity of screen surface units, and save the adding water quantity. The sawtooth wave jig recovery rates can improve Sn: 3.01%, WO3:5.5%, Pb: 1.63%, Zn: 2.04%, the water consumption lowers down 30-75%.2. Applied rangeSawtooth wave jig can handle various particle sizes raw materials except some fineness ore. Simple operation, large capacity, and can get some final products in single separation. It is widely used in the production process. For metal ore, is a better equipment to deal with coarse, medium and fine grain of iron ore and manganese, also used in separation tin, tungsten etc; The jig separation also has extensive use in gold, tantalum, niobium titanium, chromium etc raw ore and placers, as well as the adamas; Also can have a better result in zinc oxide ore.3、Specifications, structure form3.1 SpecificationsSawtooth wave jig structure (see figure 1, figure 2, figure 3, figure 4 figure 5.Figure 1:JT2-2 Sawtooth wave jig structureFigure 2:JT0.57-1、JT1-1 Sawtooth wave jig structureFigure 1、Figure 2:Dressing tank part 2. Rubber diaphragm part 3. Cone bucket part4. Electromagnetic control motor part 5. CAM box part 6. Supply pipe flanges 7. Sieve net 8. Feed chuteFigure 3:JTO.57-1、JT1-1、JT2-2 CAM box structureBox 2. Lever 3 6. 7206 bearing 4、7、8.Adjustment gland 5 gear axle9. bearing 313 10. Bearing 8112 11. The crankshaft 12, 15, 23, 17. Nut 13. Dustproof set 14. Punch 16. CAM 17. Punch base 18. Axis 19. Joint bearing inner ring 20. Joint bearing outer ring 21. Circle cover 22. Axis 24. Gear 25. 2216 bearing 26. Angle Adjustment gear 28. Axis 29. 7207 bearing 30. Bearing coat (roller) 31. back cover plate 32. Adjustment screwFigure 4:JT3-1 Sawtooth wave jig structure1. The screen cloth 2. Dressing tank 3. Cone bucket 4. CAM box transmission mechanism 5. Spring 6. Electromagnetic control motor 7. Rubber diaphragmFigure 5:JT3-1CAM Box1. Box 2. Lever 3、5. 7308 bearing 4、gear shaft 6. reinforced seal 7. bearing 3158 8. Bearing 8113 9. The crankshaft 10. Dustproof 12. CAM 13. Punch base 14. Axis 15. Joint bearing inner circle 16. Joint bearing outer ring 17. shaft sleeve 18. Axis 19. Gear 20. Bearing 2518 21. flange 22. Shaft 23. Bearing 7210 24. Roller (bearing sleeve)3.2 TypeSawtooth wave jig is divided into left and right type according to the location of water supply pipe's flange. Stand at the end of the tank looking at the discharge, if the supply water pipe flanges on the left is left type, otherwise is the right type.3.3 ModelSawtooth wave jig model is formed by its sawtooth wave jig room quantity, jig room total area, room number etc. the model shows as follows:3. SpecificationSawtooth wave jig specifications see table 14.Technical parameterTable 1JigdiaphragmParticle sizemmwater consumption m3/tWater pressureMpacapacityt/hPowerkwsize(mm)WeightkgremarksFormArea m2Stroke mmfrequency次/minJT0.57trapezium0.57(M12)8.5-12(M17)10-1780-180<61-3≥0.051-2.51.51550×780×1530610JT1-1trapezium1.04<101-32-42.22270×1110×1890900JT2-2trapezium2.28<101-34-833225×1550×20501640JT3-1trapezium3.3M15M20M2580-120<101-3≥0.056-105.53180×2000×30303260JT5-2trapezium4.86<101-310-157.53600×2000×26004500JT1.5-2trapezium1.53M25M3080-120<301-2≥0.055-833200×1550×20501520JT4-2trapezium4.33<301-210-157.53500×1850×26004600Note: Capacity and water consumption are different due to the mineral grain size, ore properties and operation conditions.5. Equipment installationJig must be installed in horizontal level and ensure the slope of the screen within design range.6 Adjustments6.1 Stroke AdjustmentSawtooth jig can be equipped with M12, M17 two specifications CAM, if no special instructions, the equipment will be installed with M17 CAM. JT3-1 can be installed M15 M20 M25 three specifications CAM, if no special instructions; will only come with M20 CAM.If need to adjust the stroke or change CAM, it must first stop the equipment, adjust the sequence as follows:(1) Discharge the lubricating oil in the CAM box;(2) Open CAM box's back cover plate;(3) Loose the spring group supporting the cone bucket, make the roller in CAM box and CAM the distance 5~20mm;(4) Use special wrench unscrews the Cam's nuts;(5) Remove CAM, replace or according to the reference Figure 6 (The curves of the CAM adjustment Angle and stroke) adjust CAM and the drive shaft's angle to change the stroke of equipment.After finish the adjustment of stroke, the Jig should be reinstalled according to the above procedure.6.2 Frequency adjustmentThe equipment's frequency changing is realized through change of the motor speed, the frequency and the motor speed ratio is 1:6 , it can change the motor speed by adjusting the electromagnetic control device , and according to the requirement to adjust the frequency.6.3 Spring adjustmentThe equipment's spring set is to reset the cone bucket up, the spring adjustment must be in stop condition. Ensure the spring compression of each spring to the basic same (measurement the compression spring length) and make idler wheel in the CAM box and CAM rollers in good contact condition, which means no impulsive sound after the operation. However if the spring is too tight, the friction between the idler wheel and the CAM rollers will increase, which will aggravate the equipment's load and speed up components wear down.7. Operation7.1 Precautions before the operationBefore operation, please read the instruction and master the scope of equipment and its operation method.The power supply of the motor is three-phase AC 380 V; the electromagnetic motor control devices' power is 220 V. Before turn on the power, one should check whether the power supply voltage is in accordance with the provisions, the filling water pressure meets the requirements, and the drive shaft's rotation is flexible, no clamping stagnation (rotate when the spring set is loosening).7.2 Operating requirementsDifferent specifications of the screen cloth can be provided; if no special requirement from the user, the equipment will only be equipped with 6 mm x 6 mm screen cloth. When the equipment is used to separate less than 5 mm materials, it must lay the artificial bed on the screen. The density, particle size, shapes and thickness of artificial beds has a significant effect on the speed and quality of the discharged ore. Therefore, the selection of artificial stone bed should follow:(1) The particle size of artificial bed stone should be as 2-6times as the largest size of the feed ore, and 1.2-2 times as the screen mesh, and the specific gravity is close to or slightly smaller than heavy mineral. Such bed stone can always stay at the bottom of the layer, and have the appropriate space allows heavy mineral's fine particles through. Usually chooses magnetite etc which can meet requirements as artificial bed stone layer.(2) The thickness of artificial stone bed will influence the quality and yield rate of the concentrate. When processes the easy dressing ore or to get higher concentrate yield rate, the artificial bed layer should be more thin; otherwise the artificial bed layer should be more thick. Artificial beds are usually in thickness 30mm-100mm.(3) Should adjust the artificial stone bed's the particle size, layer thickness, during the ore processing in order to get the best concentration result.7.3 Operation instructionsWhen the e>quipment is in accordance with 7.1, 7.2 requirements start the operation. The operation sequence as follows:(1) Turn on water supply valve, when the jig room filled with water; regulate the water supply quantity to meet the ore dressing requirements.(2) Turn the electromagnetic valve motor control device to minimum (counterclockwise), then start motor.(3) When the motor's speed is stable, slowly turn the electromagnetic motor control device's knob (i.e. regulating frequency).(4) After the normal operation of the equipment,feed the ore evenly.According to the ore property, adjust the equipment's stroke, frequency,water supplies, make it to achieve the best ore dressing result.When stop the equipment, it must first stop the ore feed, then minimize the stroke, finally to turn off the main motor's power supply.8. Lubrication The CAM box uses 30 # machine oil for lubrication, the volume of oil had better be when the driving gear immerge into the lubrication oil 30-50mm, if new equipment, should change the lubrication oil half a month and clean the tank. Each quarter clean the tank and change lubrication oil, ball bearings parts need to use ZNG69-2 ball bearing grease for lubrication, change the grease every half year.Sawtooth Jig Wearing Parts DirectoryNo.NameModelQtyRemarks039-4-0Discharge Tube2JT2-2039-9-0Spring4JT2-2039-17-0screen cloth2JT2-2039-19-0diaphragm2JT2-2077-5-0-0screen cloth1JT0.57-1077-6-0-1Discharging tube1JT0.57-1077-6-0-3diaphragm1JT0.57-1077-6-0-9Spring3JT0.57-1077-6-0-0dirt-proof boot1/2JY0.57-1\JT1-1/JT2-2039-7-14CamM121039-7-14ACamM171039-7-15Adjust Angle gear1039-7-21bent axle1038-10101Roller (bearing sleeve)1039-7-44Gear shaft1039-7-48shaft sleeve2ZQSn6-6-3039-7-53Joint bearing outer ring1付ZQSn6-6-3039-7-54Joint bearing inner circle1conical roller bearing72062conical roller bearing76072conical roller bearing22161single-row radial ball bearing3131Thrust ball bearing81121311-screen cloth1JT3-1038-907diaphragm1JT3-1311-14ASpring3JT3-1311-0722dirt-proof boot1JT3-1311-0709ACam1JT3-1311-0716ARoller (bearing sleeve)1JT3-1311-0749Agear shaft1JT3-1311-0727shaft sleeve2ZQSn6-6-3JT3-1311-0733Joint bearing outer ring1ZQSn6-6-3JT3-1311-0734Joint bearing inner circle1JT3-1single-row tapered roller bearing72102JT3-1single row roller bearing25181JT3-1single-row radial ball bearing3151JT3-1Cone thrust bearing73082JT3-1single-row tapered roller bearing8113JT3-1Oil SealPG40×62×121JT3-1
Other products